A road approach to Lida from the M11 highway is 70% complete. The works are carried out as part of the Belarusian Roads state program. The road section is 4.3km long.
A road approach to Lida from the M11 highway is 70% complete. The works are carried out as part of the Belarusian Roads state program. The road section is 4.3km long.