Daily Snapshot
20 чэрвеня 2026, 13:28
Reconstruction of M11 highway section is underway
A road approach to Lida from the M11 highway is 70% complete. The works are carried out as part of the Belarusian Roads state program. The road section is 4.3km long.
BelTA – News from Belarus, © Belarusian Telegraph Agency, 1999-2026. All rights reserved.
If you use BelTA’s materials, you must credit us with a hyperlink.
Terms of Use Technical support by BelTA
- 2026