Версия для печати
Размер шрифта:
Фото
Печатать
Economy
21 ліпеня 2025, 09:55

New BelAZ haulers to help at Russia’s largest copper deposit

MINSK, 21 July (BelTA) - Eight 240-tonne BelAZ haulers will be shipped to help out in copper ore mining in a permafrost zone, BelTA learned from the BelAZ press service.

The new truck haulers will join the fleet of BelAZ mining equipment operating at Udokan, Russia’s largest copper deposit. Two BelAZ-7531 truck haulers will be shipped to the Far East in July, with six more to follow in August-September.

According to the company, the first batch of ten 130-tonne BELAZ haulers arrived at Udokan in 2022. The latest delivery features even more powerful machinery. The 240-tonne truck haulers will help miners in the Trans-Baikal region boost open-pit copper production volumes and improve the efficiency of the mining and processing plant.
The 240-tonne BelAZ-7531 machinery is designed for reliable operation in harsh mining, geological, and climatic conditions at the high-altitude Udokan deposit, located in a permafrost zone.

Equipped with integrated ROPS/FOPS cabin protection systems and advanced climate control, these trucks ensure operator safety and comfort despite extreme temperature fluctuations - from -50°C in winter to +35°C in summer.
This page is available at:
https://eng.belta.by/economics/view/new-belaz-haulers-to-help-at-russias-largest-copper-deposit-169824-2025/
BelTA – News from Belarus, © Belarusian Telegraph Agency, 1999-2026. All rights reserved. 
If you use BelTA’s materials, you must credit us with a hyperlink. Terms of Use
Technical support by BelTA
- 2026