
The bridge is being built in Mosty District. Four of the five supports have already been erected. The spans are being assembled on a special site. Each is 63 meters long. The new road bridge is planned to be put into operation in 2023.
The bridge is being built in Mosty District. Four of the five supports have already been erected. The spans are being assembled on a special site. Each is 63 meters long. The new road bridge is planned to be put into operation in 2023.